1.OEM factory conditions:
The factory is only a processing plant, different applicant/manufacturer use a OEM factory, according to the manufacturer to provide design and production process control and inspection requirements, the OEM factory under the system of production, use different manufacturer's trademarks, should according to different applicants as different factory management, system elements don't repeat review, but the production process control and inspection, product consistency examination shall not exempt.
2.ODM factory status:
Different applicants/manufacturers use the same design, quality system and production process control and inspection requirements to produce and use trademarks of different manufacturers. This situation is confirmed by the certification authority document and can be exempted from the factory inspection. (under the same conditions of production, the type of product structure is exactly the same, except for trademark or product models, which are verified by the documents and can be exempted from type test.)
3. Current assembly production methods similar to mobile phone products:
In the form of CKD or SKD parts assembly production, some tests after assembly, assembly content may be will matter, but labeling and certification marks, nameplate production origin for the factory, the mandatory product certification factory should be the assembly plant, but should be strict censorship control requirements of the supplier.
4. In the production of A, replace the plug and label:
In A manner of production and testing, but to enter the Chinese market, meet the requirements of China, convenient in another site B (probably workshop, repair station, warehouse, etc.) change the plug and stick mark, should be A mandatory product attestation factory factory, but should control audit A factory for B factory, B plant can arrange special access when necessary.
5. Ⅲ class electrical appliance factory:
The factory production of electrical products Ⅲ Ⅲ only class electrical products, outsourcing power adapter, in Ⅲ type electrical appliance factory testing, packing, the factory, factory location for the plant management. The certification body shall strictly examine the control of the supplier to the power adapter and, when necessary, arrange special access to the supplier of the power adapter that has not been certified by the unit.
6. The machine in A factory, in factory B only to A card and software, mandatory product certification should be aimed at A factory dealing with B factory factory operational control of the production site and factory audit object is A plant.
1. The applicant shall submit an application to the certification authority
2. The certification body accepts the application and assigns the test tasks to the designated testing laboratory
3. The laboratory will complete the inspection and submit the report to the certification body
4. The organization shall organize the inspection of the factory and submit the inspection report to the factory after completing the review
5. Certificate of CCC issued by the certification body
6. The applicant applies for purchasing or applying for the printing/molding CCC mark
|